Region specific
Last updated: 2025-02-07
Reference the region specific forms that are customized for region processes and procedures when administering a construction contract.


- Ancillary Spread Sheet.xlsx
- AncillaryConcTracking.xlsx
- AsStakedRWDcmt.xlsx
- CABCPrePlcmtMtg.doc
- ConcDeckPourAuthr.docx
- ConModEst.xls
- ConModLangAgrQtys.docx
- ConModLangRR Flg.docx
- ConstructionStartChecklist.docx
- DailyAsphRec.docx
- Dewatering.docx
- EmergPhoneNos.docx
- JointRepairLogSht.docx
- NCRPhoneList.pdf
- NCR Supplemental PE Guide 2025.pdf
- NCRWZTrafIncResp.pdf
- NOT Maintenance Memo Agreement Template.pdf
- PlanEval_DQIUpdate.pdf
- PreConAgenda-Minutes.docx
- PreConInviteForm.pdf
- ProjFieldOfc.docx
- PunchList.docx
- RptReleaseTrkg.xlsx
- SignInSheet.docx
- TMPEvaluationForm.pdf
- Weekly Communications Update Template.docx


- 2024 NER Field Office Postings.pdf
- 2024 NER Supplemental Construction Administrative Guide.pdf
- As-StakedRW.xls - As-Staked R/W Documentation
- BrdgPaintingConcStaining.docx - Bridge Painting Concrete Staining
- LaborComplianceEEOFieldInterview.dotm - Labor Compliance EEO Field Interview
- LPWeeklyConstrUpdate.docx - Local Program Weekly Construction Update
- NewsRelease.docx
- PreconConferenceAgenda.docx - Preconstructon Conference Agenda
- PreconConferenceAttendance.docx - Preconstruction Conference Attendance
- PreconConferenceInvitation.docx - Preconstruction Conference Invitation
- ProjEngineerLaborComplianceChklst.docx - Project Engineer Labor Compliance Checklist
- RecordsBoxLabel.docx
- SpecialtyItemsMaintenance.docx
- TraffSignalAndLightingInspChcklst.docx - Traffic Signals and Street Lighting Inspection Checklist
- UniqueStrucVertClr.docx - Unique Structure Vertical Clearance

- 2025-distribution-delivery-sched.pdf - Mateirals Lab Delivery & Pickup Schedule
- ConcBrdgDeckPrePourAgenda.docm - Concrete Bridge Deck PrePour Agenda
- ConcBrdgSubStrucPrePourAgenda.docm - Concrete Bridge Structure PrePour Agenda
- ConcDeckPourAuth(StrucNo).doc - Concrete Deck Pour Authorization Form
- ConcPvmtPrePourAgenda.docm - Concrete Pavement PrePour Agenda
- MaterialProjRecordsChklst_20190723.xltx - Material Project Records Checklist
- NE Region Digital Material Archive Guidance Document.pdf
- RandNoBackfill.xltm - Random Number Calculator for Backfill
- RandNoBAD.xltm - Random Number Calculator for Base Aggregate Dense

- Aggregate Stockpile Failure_DT1310 Entry Example.docx
- Buy America Exemption_DT1310 Entry Example.docx
- Disincentive Air Voids HMA Pavement_804.2015_DT1310 Entry Example.docx
- Disincentive Density PWL HMA Pavement_804.2010_DT1310 Entry Example.docx
- Disincentive IRI Ride_804.4410_DT1310 Entry Example.docx
- Disincentive Strength Concrete Pavement_804.6050_DT1310 Entry Example.docx

- ner-107-075 Excavation of Phragmites Soil (dept determines waste site).doc
- ner-107-080 Excavation of Phragmites Soil (waste designated on site).doc
- ner-203-010 Removing Rumble Strips.doc
- ner-203-015 Removing Rumble Strips.doc
- ner-207-015 Roadway Embankment.doc
- ner-300-005 Flowable Fill Material.doc
- ner-301-005 Limestone Screenings 0.375-Inch.doc
- ner-301-015 Traffic Bond Limestone 0.375-Inch.doc
- ner-415-005 Concrete Pavement Cold Weather Covering.doc
- ner-415-010 Cross Stitching Longitudinal Cracks.doc
- ner-415-025 Slot-Stitching.doc
- ner-415-030 Concrete Joint and Crack Cleaning.doc
- ner-415-035 Concrete Pavement Approach Slab SHES.doc
- ner-460-010 Sealing Asphaltic Pavement Cracks.doc
- STP-460-030 460.0115.S HMA Volumetric TS.doc
- STP-460-030 460.0120.S HMA Density TS.doc
- STP-460-040 460.0105.S HMA PWL Volumetric TS.doc
- STP-460-040 460.0110.S HMA PWL Density TS.doc
- STP-460-040 460.2005 Incentive Density PWL.doc
- STP-460-040 460.2010 Incentive Density Air Voids PWL.doc
- STP-460-075 460.2007 Incentive Density LJD.doc
- STP-460 460.2000 Incentive Density HMA.doc
- ner-520-005 Culvert Pipe Concrete Collar SHES.doc
- ner-520-020 Smooth Steel Casing Pipe.doc
- ner-520-025 Foundation Backfill.doc
- ner-601-005 Concrete Curb and Gutter 30-Inch SHES Type A.doc
- ner-601-010 Concrete Curb and Guter 4-Inch Sloped 30-Inch Type G Special.doc
- ner-601-015 Concrete Curb and Gutter Cold Weather Covering.doc
- ner-601-020 Concrete Landscaping Curb.doc
- ner-602-005 Concrete Sidewalk, California Picture Frame.doc
- ner-608-010 Marker Balls.doc
- ner-608-015 Mini Storm Sewer; Mini Storm Sewer Lateral.doc
- ner-608-020 Mini Storm Sewer Cleanouts.doc
- ner-608-025 Reconnect Existing Storm Sewer Lateral.doc
- ner-608-030 Storm Sewer Reinforced Concrete Class V Jacked.doc
- ner-608-040 Storm Sewer Tap.doc
- ner-608-045 Storm Sewer Tee (Inch) x (Inch).doc
- ner-611-010 Adjusting Manhole Covers with Rubber Rings.doc
- ner-611-015 Cover Plates.doc
- ner-611-020 Inlet Extension Ring.doc
- ner-611-030 Inlets 2x2.5-FT, Special.doc
- ner-611-040 Manhole Extension Ring.doc
- ner-611-055 Reconditioning Inlets.doc
- ner-611-060 Reconditioning Manholes.doc
- ner-611-065 Repairing Slotted Vane Drain.doc
- ner-612-005 Salvaged Pipe Underdrain Endwalls.doc
- ner-614-010 Parts for HT 4-Strand Cable Guard TL-4.doc
- ner-616-015 Replacing Fence Posts.doc
- ner-645-015 Landscape Edging.doc
- ner-646-030 Removing Raised Pavement Markers.doc
- ner-646-035 Removing Raised Pavement Markers (when retrofitting dowels).doc
- ner-900-005 Adjusting Sanitary Manhole Covers.doc
- ner-900-010 Adjusting Water Service Curb Stops.doc
- ner-900-015 Adjusting Water Valve Boxes.doc
- ner-900-020 External Chimney Seals.doc
- ner-900-025 Frame and Chimney Seals.doc
- ner-900-035 Insulation Board.doc
- ner-900-040 Protective Polymer Coating at Snowmobile Trail Crossings.doc
- ner-900-045 Protective Thermoplastic Coating at Snowmobile Crossing.doc
- ner-900-050 Removing Fire Hydrants.doc


- FlsProcFlow.docx
- NWRegConstAdminMan.docx (To be posted soon. Contact the NW region contract specialists for details.)
- NWR-inspection-guidelines.docx


- 2019BureauOfStructuresContacts-General.pdf
- 2019NWRConstrTrainingFinalAgenda.pdf
- 2019NWRPhonelist.pdf
- CMJFormEffective20190305.pdf
- dtsd-newsreleasenwr.doc
- FinalsProcessFlowDiagram.pdf
- NWRegionAsbuiltInstructions.pdf
- NWRegionFinalProjectChecklist.pdf
- ProjectStartNewsReleaseTemplate.docx
- WklyConstrUpdateBlankForm2019wMaterials.docx



- Checklist - Baseline CPM Schedule Review.pdf
- Checklist - Update CPM Schedule Review.pdf
- CPM Schedule Review Guidelines.pdf
- Sample Schedule Review Comments.pdf

- Activiites with Constraints - Example.pdf
- Activity Logs - Example.pdf
- All Activities - Example.pdf
- All Activities with Calendar - Example.pdf
- Calendar p5D W&H - Example.pdf
- Calendar p6D W&H - Example.pdf
- Comparison Baseline - Example.pdf
- Comparison Update - Example.pdf
- Comparison Update Finish Variance Less Than 0 - Example.pdf
- Comparison Update Longest Path - Example.pdf
- Critical Activities - Example.pdf
- Float Path (All Critical) Open All Roadways - Example.pdf
- Float Path (Most Critical) Open All Roadways - Example.pdf
- FP02 to Complete Stage 2 - Example.pdf
- Longest Path - Example.pdf
- Milestone Activities - Example.pdf
- Pred Succ Bar Chart - Example.pdf
- Pred Succ Tabular Report - Example.pdf
- Schedule Changes (UP13 vs. UP14) - Example.pdf

Region CPM Schedule Review V3.pptx

- 00 Waukesha Bypass Baseline Extra Columns.pdf
- 02 Waukesha Bypass Weather Exclusion.pdf
- 03 Utilities and Work by Others.pdf
- 04 Logic and Sequence.pdf
- 05.2 Level of Detail.pdf
- 06 Equip Workforce Req.pdf
- 07 Logic Forced Critical Path.pdf
- 13.2 Out-of-Sequence Progress.pdf
- 15.1 Delay Impacts.pdf
- 15.2 Delay Impacts.pdf
- 15.3 Delay Impacts.pdf
- 22 Spec - 108 Prosecution and Progress - ss-01-08.pdf
- 1229-04-76 Schedule Changes (UP06 vs. UP07).pdf
- 1310-10-70 - STH 50 June UP15 Review 220707 R1.pdf
- Activities with Constraints - IH 43 N-S Capitol to Hampton BL05 - 210817.pdf
- Actual Dates.pdf
- Adverse Weather Zoo IC North Proposal.pdf
- Anticipated Weather.pdf
- Calendars.pdf
- Comparison BL05 Baseline - STH 50 August UP17 - 220913.pdf
- Comparison UP16 Update - STH 50 August UP17 - 220913.pdf
- Crew Resources.pdf
- Data Date.pdf
- Float Path 4 (1-1) to Complete Stage 8 - STH 50 August UP17 - 220913.pdf
- Holiday Work Restrictions.pdf
- IH 43 N-S County Line Rd IC BL Review 220404.pdf
- Lack of Progress.pdf
- Longest Path - STH 50 August UP17 - 220913.pdf
- Narrative Specification.pdf
- NS04 Schedule Template.pdf
- Pages from 20201208015proposal.pdf
- Sub 276 - STH 50 - CPM Narrative August 2022.pdf
- Submittal Procurement Activities - Zoo IC North Leg BL R4 - 210505.pdf
- Time Extension.pdf
- Update UP16 July Schedule Changes - 220816.pdf
- UPRR Baseline Activities.pdf
- Utility Activities - IH 43 N-S Capitol to Hampton BL05 - 210817.pdf
- Waukesha Bypass C-67-91.pdf
- Waukesha Bypass Contactor Stage 2B.pdf
- Waukesha Bypass Design Stage 2B.pdf
- Waukesha Bypass R-67-129.pdf
- Waukesha Bypass Stage 2B Actual.pdf
- What-if - Flash Butt Weld Fragnet R1.pdf
- Zoo IC Contractor Fragnet.pdf

- Critical Path Method (CPM) Training Transcript_2023-01-26.docx
- Critical Path Method (CPM) Training-20230126_VideoOnly1.mp4
- Critical Path Method (CPM) Training-20230126_VideoOnly2.mp4
- Critical Path Method (CPM) Training-20230126_VideoOnly3.mp4
- Critical Path Method (CPM) Training-20230126_VideoOnly4.mp4
- Critical Path Method (CPM) Training-20230126_VideoOnly5.mp4

- 2023_6_Underground Inspection.pdf
- 2023_9_Aboveground Inspection.pdf
- ConcPvmtThicknessLog.xlsx
- DQIReviewProjClose Agenda.docx
- Electrical Service Installation Process.pdf
- EmergencyResponseProtocol.pdf
- ExpansionJoint.xlsx
- HMAChecklist.xlsx
- Pre-PaintMeetingAgenda.docx
- ProjStartupChklst1.docx
- PropertyOwner'sLetter.docx
- RailroadChklst.docx
- RFPTemplate.docx
- SeedCareHandout.docx
- Shared Select Site Memorandum.pdf
- SodCareHandout.docx
- StormSewerLayout.xlsx
- Temp business sign SE Region 1-26-2023.doc
- Vertical Clearance Guidance 2023.pdf
- WAFTemplate.docx
- WeeklyProgressMeetingAgenda.docx
- wisdot-letterhead-template.docx

- 905 Guide.docx
- 905 Report Example.pdf
- AncConcBidItems.xlsx
- Base Aggregate Tracking Sheet 2024.xlsx
- Close Out Letter.docx
- ConcDeckPourAuthorization.docx
- Concrete CY Tracking Sheet 2024.xlsx
- Concrete LF Tracking Sheet 2024.xlsx
- ConcreteBridgeDeckPrePourMtg.docx
- ConcreteBridgeSubStrucPrePourMtg.docx
- ConcretePvt&BarrierPrePourMtg.docx
- DT1310 Guidance.docx
- HMANotification2024.xlsx
- HMAprepavemtg2024 .docx
- MTguide.pdf
- MtlFinalsCheckIn.docx
- MtlFinalsCheckIn2024.docx
- MtlHelpfulHints.docx
- NucDensityIncentive.xlsx
- QMPHMA&AcceptanceTracking2024.xlsx